Our System

1 Driving Head — The Ram Jack® driving head delivers rapid power to long sections of piling for a faster installation and a stronger pile.

2 Hydraulic Rams — They have over 70,000 lbs. of driving force available to deliver to the Ram Jack® pile column.

3 Bracket — The Ram Jack® bracket has been tested in excess of 100,000 lbs. of force.

4 Guide Sleeve — The extended guide sleeve loads the piling vertically and rifles the piling as it advances to load bearing strata.

5 Steel Pier — The Ram Jack® steel pile material has been tested and specifically selected for its unusually high quality to resist bending and buckling. Tensile tests average 150,000 lbs.

6 Pile Connector — The 10 inch pile connector is composed of a smaller diameter section of the same high quality tubing and is crimped into one end of each pile section. The connector is a slip joint into the next pile system.

7 Expansion Ring — This ring expands the soil away from the piling to reduce friction during the driving process for maximum penetration through unstable soil.

8 Soil Plug — Creates a solid base for the lead pile section to bear on firm strata.